Project Overview

The Mars Pouch Facility project involved the construction of a 7,800m² industrial building designed to optimize production for Mars’ individually pouched products. The structure was divided into three main sections:


  • Meat Preparation

  • Cooking Hydro Equipment

  • Packaging Area & Platform

Our scope included the structural steel installation for a multi-level building, along with the installation of all floor grating and fabricated staircases in tight areas with minimal access.
This work was completed under strict compliance with Mars’ operational requirements, ensuring safety and quality standards were maintained throughout the project in a live facility environment.

Details: